Via Apple Podcasts | Via Spotify
In September of 2023, Pepperdine broke ground on the Mountain at Mullin Park, a new addition to campus that will include, a new arena, rec center, dining and more when it is finished in 2026, but for now construction is ongoing
The project is the largest new addition to campus in more than two decades and has already had significant impacts on campus as construction is underway. Listen in to this episode of the Graph to hear what current students have to say about the project (1:04), how the project came to be, stretching back over 40 years, and the logistics and funding that it takes to create the Mountain.
____________________________________________________________________
Listen in, and let us know what you think. Email us at graphic@pepperdine.edu, or follow us on Instagram and Twitter @peppgraphic.
This episode of “The Graph” is hosted and produced by Joe Allgood. “The Graph” is a Pepperdine Graphic Media production.
Original theme music and transition music composed by Johnathan Hodges.
Note: This episode and the interviews within were done at the end of the spring 2024 semester. the words and sentiments express the progress of the Mountain at that time.