• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
  • Skip to footer
  • About Us
  • Contact
  • Advertising
  • Join PGM
Pepperdine Graphic

Pepperdine Graphic

  • News
    • Good News
  • Sports
    • Hot Shots
  • Life & Arts
  • Perspectives
    • Advice Column
    • Waves Comic
  • GNews
    • Staff Spotlights
    • First and Foremost
    • Allgood Food
    • Pepp in Your Step
    • DunnCensored
    • Beyond the Statistics
  • Special Publications
    • 5 Years In
    • L.A. County Fires
    • Change in Sports
    • Solutions Journalism: Climate Anxiety
    • Common Threads
    • Art Edition
    • Peace Through Music
    • Climate Change
    • Everybody Has One
    • If It Bleeds
    • By the Numbers
    • LGBTQ+ Edition: We Are All Human
    • Where We Stand: One Year Later
    • In the Midst of Tragedy
  • Currents
    • Currents Spring 2025
    • Currents Fall 2024
    • Currents Spring 2024
    • Currents Winter 2024
    • Currents Spring 2023
    • Currents Fall 2022
    • Spring 2022: Moments
    • Fall 2021: Global Citizenship
    • Spring 2021: Beauty From Ashes
    • Fall 2020: Humans of Pepperdine
    • Spring 2020: Everyday Feminism
    • Fall 2019: Challenging Perceptions of Light & Dark
  • Podcasts
    • On the Other Hand
    • RE: Connect
    • Small Studio Sessions
    • SportsWaves
    • The Graph
    • The Melanated Muckraker
  • Print Editions
  • NewsWaves
  • Sponsored Content
  • Digital Deliveries
  • DPS Crime Logs

Broad Beach storm drains construction in progress

September 5, 2012 by Al Lai

The Malibu City Council will meet to discuss allocating funds for a project to improve the storm drain inlet at Broad Beach next week according the Malibu Patch. The meeting is scheduled for Sept. 10 at the Malibu City Hall.

In the lawsuit settled in April, the Natural Resourced Defense Council and the Santa Monica Baykeeper accused Malibu of violating the Clean Water Act. Under the settlement, Malibu agreed to fulfill multiple obligations including improvements in the eight storm drains inlets at Broad Beach. The total cost of all the improvements could peak over $5.6 million. Nevertheless, the cost of this construction is expected to be paid for by a State Water Board grant, according to Malibu’s Senior Civil Engineer Robert DuBoux. “The settlement agreement included improvements to one additional storm drain inlet, a design that will reduce bacteria levels and eliminate non-stormwater discharges and the installation of monitoring and sampling equipment,” DuBoux said.

 

Filed Under: News

Primary Sidebar

Categories

  • Featured
  • News
  • Life & Arts
  • Perspectives
  • Sports
  • Podcasts
  • G News
  • COVID-19
  • Fall 2021: Global Citizenship
  • Everybody Has One
  • Newsletters

Footer

Pepperdine Graphic Media
Copyright © 2025 · Pepperdine Graphic

Contact Us

Advertising
(310) 506-4318
peppgraphicadvertising@gmail.com

  • Facebook
  • Instagram
  • Twitter
  • YouTube
(310) 506-4311
peppgraphicmedia@gmail.com
Student Publications
Pepperdine University
24255 Pacific Coast Hwy
Malibu, CA 90263
  • Facebook
  • Instagram
  • Twitter
  • YouTube